In this project HoSt realised a digesting installation in the city of Eppeville in France. The industrial digestion installation has a capacity of 35.000 tons per year. HoSt also developed an biogas upgrading installation in this project for upgrading biogas to biomethane.
PROJECT SPECIFICATIONS |
|
Location | Eppeville, France |
Start construction | September 2015 |
Start-up | November 2016 |
Capacity | 35.000 tons/year |
Input | Manure, sludge, vegetables waste, straw and agriculture waste |
Digester(s) | 2 x 2.281 m³ |
After-digester(s) | 1 x 2.281 m³ |
Solid feeding input | 2 x 80 m³ Solid Feeding System |
Pre-storage | 100 m³ + 300 m³ |
CHARACTERISTICS |
|
|
BIOGAS UPGRADING
In this project HoSt realised in Eppeville, France besides the digesting installation also a biogas upgrading system for upgrading biogas to biomethane. The upgrading system has a capacity of 400 Nm3/hr biogas and upgrades the gas to 210 Nm³/hr biomethane. The upgraded gas will be injected into the gas grid.
Capacity | 400 Nm³/hr biogas 210 Nm³/hr biomethane |
Methane concentration raw biogas | 50-55% |
Methane concentration product gas | > 93% (gas type B) |
Efficiency | > 99% |
More information
Do you want to receive more information about our biogas plants and biogas upgrading technology or do you want to know what HoSt can do for you? Don’t hesitate to contact us through [email protected] or call us on +31 (0)53 – 460 90 80. We also have an office in France.