Krāslava, Latvia

In Kraslava, an old boiler system is replaced by a wood-fired boiler. This boiler is integrated with an existing steam turbine.

Project Milestones

Start construction August 2007
Start-up / First Fire April 2008

Specifications

Wood storage 400 m³
Fuel supply system Feeds three boilers, (of which 2 existing boilers)
Furnace Fresh wood chips, 30-55% moisture
Flame tube boiler 9 MWth, 15 barg/250°C

Characteristics

  • Wood supply system integrated for three boilers
  • Steam Sided integration with existing steam turbine