In Kraslava, an old boiler system is replaced by a wood-fired boiler. This boiler is integrated with an existing steam turbine.

PROJECT MILESTONES

Start construction August 2007
Start-up / First Fire April 2008

SPECIFICATIONS

Wood storage 400 m³
Fuel supply system Feeds three boilers (of which 2 existing boilers)
Furnace Fresh wood chips with 30-55% moisture
Flame tube boiler 9 MWth, 15 barg /250°C

CHARACTERISTICS

  • Wood supply system integrated for three boilers
  • Steam Sided integration with existing steam turbine