In Sisak (HR), HoSt built a wood-fired CHP plant. This plant will supply hot water to the district heating, steam to surrounding industries and electricity to the grid.
The prunings and the wood waste as fuel comes from the Sisak area. HoSt is responsible for the turn-key supply of the plant. The entire project is realized together with several local contractors.
PROJECT MILESTONES |
|
Start project | November 2015 |
Start-up / first fire | November 2016 |
SPECIFICATIONS |
|
Wood storage | 250 m2 |
Wood supply system | Chain scraper |
Furnace | 6.4 t/h wood |
Water tube steam boiler | 15 kWth |
Steam turbine | 3.2 MWe |
Steam condenser | 10.7 MW at 85°C |
Steam extraction | 7.5 t/h at 16 bara and 300 °C |
Electro static precipitator | Provisions taken for future placement of electro static precipitator, to meet stricter emission requirements |
Efficiency | >91% |