The biogas plant in Piekoszów was the first installation in Poland built by HoSt. The installation is built next to the slaughter house and optimally equipped to digest category 3 material, including slaughterhouse waste and blood. About 25% of the input is slaughterhouse waste and 30% is pig manure, which is supplemented with corn and waste from the food industry.
PROJECT MILESTONES |
|
Start construction | June 2010 |
Startup | September 2011 |
SPECIFICATIONS |
|
Capacity | 30,000 m³/year |
Input | Pig manure, slaughterhouse waste, corn, food waste |
Digesters | 2 x 1,526 m³ |
After-digester | 1 x 1,526 m³ |
CHP(s) | 1 x 800 kWe MWM |
Solid feeding input | 40 m³ mixing/dosing bin with input screws |
Pre-storage/receipt | 500 m³ tank, 100 m³ polyester silo |
Sanitation | 10 m³ sanitation unit, 1 hour on 70 °C |
CHARACTERISTICS |
|
|