Pig innovation centre Sterksel is, in cooperation with the Wageningen University and Research Centre (WUR), a research and innovation centre for renewable energy and pig farming. A biogas plant was already built, after which HoSt built a new digester with a solid feeding system and CHP unit. This new digester is integrated with the existing plant. HoSt has added a new control system so that the whole system is easier to operate. The plant produces 2.9 million kWh electricity per year.
PROJECT MILESTONES |
|
Start Construction | November 2008 |
Startup | April 2009 |
SPECIFICATIONS |
|
Capacity | 40,000 m³/year |
Input | 50% pig manure; 50% residual |
Digester(s) | 1 x 2,200 m³ |
CHP(s) | 1 x 364 kWe |
Pre-storage/receipt | Linking with existing installation |
Solid Feeding input | 30 m³ mixing/dosing bin with input screws |
CHARACTERISTICS |
|
|
More information
Do you want to receive more information about our biogas plants or do you want to know what HoSt can do for you? Don’t hesitate to contact us through [email protected] or call us on +31 (0)53 – 460 90 80.