The Biona Gas project is a biogas plant with a capacity of 1.5 MWe, mainly based on the input of liquid cow manure with co-products as silage corn and straw.
Situated in the village of Tsalapitsa, the 1.5 MWe biogas plant is built with a solid feeding system, a liquid input system consisting of a pump and cutter, 2 digester tanks in combination with an after-digester tank, a separator system, after-storage tanks and a building with a control and heating room, a 1.5 MWe CHP and a room for the operator.
A high efficiency is realized by applying 2-step digestion with an after-digester tank together with a high quality type of mixing.
PROJECT MILESTONES |
|
Start construction | October 2013 |
Start-up / commissioning | June 2014 |
SPECIFICATIONS |
|
Capacity | ± 40,000 tons / year |
Input streams | Mainly liquid cow manure, silage corn and straw |
Liquid input | The liquid cow manure is brought into the digestion process by a cutting and pump system from the shed to the digester tanks |
Solid input | 80 m³ mixing and dosing bin with input screws to the digester tanks |
Digester(s) | 2 x 2,280 m³ |
After-digester(s) | 1 x 2,280 m³ |
After-treatment | The digestate is seperated by a seperator into a thin and thick fraction. The thin fraction is stored in 2 x 4.592 m³ after-strorage tanks. |
CHP(s) | 1.5 MWe with flue gas cooler in building |
CHARACTERISTICS |
|
|
More information