PROJECT MILESTONES |
|
Start construction | April 2015 |
Start-up/ first fire | January 2016 |
SPECIFICATIONS |
|
Wood storage | Bunker with overhead crane |
Wood supply system | Bunker, chain scraper and hydraulic push infeeder |
Furnace | 12 MWth – 4,2 tons/hr |
Flame tube boiler | 10 MWth |
Steam turbine | 1.6 MWe at 93 °C |
Steam condensor | 8,4 MWth at 90 °C |
Bag house filter | Dust emission <5 mg/Nm³ |
Efficiency | >88% |