This biogas upgrading installation in Äänekoski, in central Finland, is the first project of HoSt in Finland and is placed at ‘Bioproduct Mill’, a ‘new generation’ bioproduct mill built by bioproducts manufacturer Metsä Fibre.
The HoSt installation upgrades the 250 Nm³/hr produced biogas to 150 Nm³/hr biomethane, which can easily be expanded to 350 Nm³/h biogas and 210 Nm³/h biomethane. The plan is to use the green gas for a CNG filling station, that is likely to be built along the main road. The gaseous CO2 from the upgrading will be used for the neighbouring paper mill which produces approximately 1.3 million tonnes of pulp annually.
PROJECT SPECIFICATIONS |
|
Location | Äänekoski, Finland |
Start construction | February, 2017 |
Capacity | 250 Nm³/hr raw biogas (future: 350 Nm³/hr raw biogas) 150 Nm³/hr biomethane (future: 210 Nm³/hr biomethane) |
Methane concentration raw biogas | 60% |
Methane concentration product gas | 97% |
Efficiency | 99,5% |