Farm scale references

SIA Charnel

Customer : SIA Charnel
Place : Priekules novads, Latvia
Year : Start construction October 2011
Branch : Agricultural sector
Delivered : Realization biogas installation for the digestion of cattle manure in combination with corn, grass and grain. Net content steel mixing tank 1 x 254 m3, net content  digester 2 x 1.835 m3, net content after-digester 1 x 1.835 m3, 1 x 1,2 mw WKK in cointainer.

 

SIA Zemturi Z/S

Customer : SIA Zemturi Z/S
Place : Valmiera, Latvia
Year : Start construction 2011
Branch : Agricultural sector
Delivered : Expansion biogas installation for the digestion of cattle manure in combination with corn, grass and grain. Also delivered separator. Net content of the digester 1 x 1.348 m³, 1 x 364 kWe CHPs in container.

 

SIA Bio Ziedi

Customer : SIA Bio Ziedi
Place : Dobeles Pagasts, Latvia
Year : Start construction 2011
Branch : Agricultural sector
Delivered : Expansion biogas installation for the digestion of cattle manure in combination with corn, grass and grain. Net content digester 1 x 3.166,5 m3

 

STL Energy Ltd.

Customer : STL Energy Ltd.
Place : Hereford, United Kingdom
Year : Started construction 2011
Branch : Agricultural sector
Delivered :

Realization biogas installation for the digestion of cattle manure, broiler manure, apple pommes and silage corn. Net content of the digesters 2 x 2.015 m³, net content of the afterdigester 1 x 1.350 m³, 1 x 1.560 kWe CHP in outer casing.

Reference sheet Hereford

 

SIA Zemturi Z/S

Customer : SIA Zemturi Z/S
Place : Valmiera, Latvia
Year : Start construction 2010
Branch : Agricultural sector
Delivered :

Realization biogas installation for the digestion of cattle manure in combination with corn, grass and grain. Net content of the digester 1 x 1.348 m³, 1 x 364 kWe CHPs in container.

 

SIA Bio Ziedi

Customer : SIA Bio Ziedi
Place : Dobeles Pagasts, Latvia
Year : Start construction 2010
Branch : Agricultural sector
Delivered :

Realization biogas installation for the digestion of cattle manure in combination with corn, grass and grain. Net content of the mixing tank 1 x 337 m³, net content digesters 4 x 1.835 m³, net content after-digester 1 x 1.835 m³, 2 x 999 kWe CHPs in building.

Reference sheet Bio Ziedi

 

EC. Bartos Sp. z.o.o.

Customer : EC. Bartos Sp. z.o.o.
Place : Piekoszów, Poland
Year : Start construction 2010
Branch : Agricultural sector
Delivered :

Realization biogas installation for the digestion of cattle manure combined with slaughter waste and corn. Net content of the digesters 2 x 1.400 m³, net content after-digester 1 x 1.400 m³, net content after-storage 1 x 4.000 m³, net content steel mixing tank 1 x 450 m³, 1 x 800 kWe CHP in building.

 

Pig farm practice center Sterksel

 

Customer : Pig farm practice center Sterksel
Place : Sterksel, The Netherlands
Year : 2009
Branch : Agricultural sector
Delivered : New digester and optimizing of existing digester installation. The existing installation is expanded with a digester of 1 x 1.885 m3  (Gross) and 1 CHP of 340 kWe. Existing biogasplant is optimized.

 

Cattle farm Smits

Customer : Cattle farm Smits
Place : Womnelgen, Belgium
Year : 2009
Branch : Agricultural sector
Delivered : Realisation of a biogas installation for the digestion of cattle manure combined with corn, grass and vegetables.
Net content digesters 2x 2.000 m3, net content after storage 4.000 m3, 1x 1.131 Kwe CHP positioned in building.

Reference sheet Smit

 

Pig farm Lavrijssen

Customer : Pig farm Lavrijssen
Place : Herk de Stad, Belgium
Year : 2009
Branch : Agricultural sector
Delivered : Realisation of a biogas installation for the digestion of pig manure combined with corn, grass and vegetables.
Net content digesters 2x 2.700 m3, net content after digester 2.7000 m3, net content after storage 2.700 m3, 1x 1.000 kWe CHP positioned in building.

Reference sheet Lavrijssen